
Taking Over of Sectiong 1 (Ülkü-Zonguldak) For Rehabilitation and Signalization of Irmak-Karabük-Zonguldak Railway Line Project
Within the scope of the Rehabilitation and Signalization of Irmak-Karabük-Zonguldak Railway Line Project, the Infrastructure, Superstructure and the Electromechanical works were taken over on 15 December 2015 for Section 1: Ülkü Station (including connection line to Kardemir Karabük Steel Factory) and Zonguldak Station.